ST JOHN Footbridge Update
We have completed our clients Dyer & Butler / MGroup Rail & Aviation and Network Rail scope of works by completing the civil works...
Once arriving at site, the recasement area is further examined by our brickwork supervisor, ensuring that the existing brickwork hasn’t worsened over time, this is to ensure that we can safely break out the area without further brickwork doesn’t come out, however if it has worsened we can break these down into smaller areas.
We can supply the temporary works items or our happy for these to be supplied to us, using steel irons plates, we place these following the radius of the Arch, we then drill and fix these in situ using 12mm steel threaded stud bar, steel grade 4.8, using injected resin and pull tested to the specified loading. Notifying our client on location for temporary works register and inspection regimes.
Following the above items the brickwork is then broken out by mechanical means using modern low HAV breakers ensuring that no more than 1 m2 is removed at any one location.
The area is then prepped further by removing all loose material and debris, the area is then damped down to ensure good adhesion of the specified mortar.
The brick courses are then layered up from the bottom with each course held in place by a 47mm x 50mm timber laggings and forced back to the profile of the Arch with timber wedges and screwed is ensure no failure of temporary works.
The temporary works will remain in place for a minimum of seven days until the repair strengthens, most of the time these shall remain in place longer due to access restrictions, we can carry out weekly inspection for our client if required.
We have completed our clients Dyer & Butler / MGroup Rail & Aviation and Network Rail scope of works by completing the civil works...
We have thoroughly enjoyed working on the Isle of Wight with our clients Dyer & Butler and Network Rail completing two underbridge replacements with...
Once arriving at site, the recasement area is further examined by our brickwork supervisor, ensuring that the existing brickwork hasn’t worsened over time, this...