Ballast Boards (Superstructures)

Prior to main works commencing we assisted our client with detailed design survey from digging trail pits down the bottom of the structure, the structures vary from trough pans, flat bottoms. Following on site survey works our client along with their steel fabricator detailed a set of drawings from an approved non-complex standard detail, forming a general arrangement drawing which sided with a fabrication and installation drawing. All steel was galvanized to 125microns for corrosion protection.

Some of the site we supplied the monitoring arrangements for the track support zone which included track monitoring, the CR-T management was undertaken by the client.

Following the above items we dug hit and miss bays on all the involved girders, installation the 12mm pre-fabricated steel, using hole saws, bear metal was protected using an approved paint system (M34 400micron) with the addition of nylon recessed washers, we installed the angle brackets onto the stiffeners, and braced from stiffener to stiffener to form a box frame to allow flat plates to be installed. All other bays were installed as required

On completion of the steel plates, ballast was placed back in-between the track support zones and structure and packed using Robel packing machines as required to the monitoring plan and handbook engineering requirement.

All main works were completed in multiple abnormal possessions through year 3, 4 & 5 (CP6).

Read More

Related Posts

ST JOHN Footbridge Update

We have completed our clients Dyer & Butler / MGroup Rail & Aviation and Network Rail scope of works by completing the civil works...

PARK & RINK Road Update

We have thoroughly enjoyed working on the Isle of Wight with our clients Dyer & Butler and Network Rail completing two underbridge replacements with...